Sunday, 25 October 2009


The snug.

Ems tries to talk Teddy down from the scaffolding.

Much excitement in the caravan this week with the arrival of our front door. With Tont's lovely steps to the left.

And the kitchen under construction.
The ground floor extension begins to take shape.


The oak frame.

The crane lifting the oak frame pieces into place.